AMC BOS™ was a success at the Resolution Mine, saving a borehole that had been abandoned, reducing the costs and improving the productivity of the hole.
AMC BOS FIX™ is a patent pending rapid fill grout, part of our new proactive solution for fluid loss and borehole instability – the AMC BOS™ (Borehole Optimisation System).
Down the borehole, you can’t always predict when or how things will go wrong. AMC’s new, patent pending Borehole Optimisation System (AMC BOS™) anticipates fluid loss, lost circulation and unstable zones.
AMC Borehole Optimisation System™ (AMC BOS™) successfully controlled fault zones and changing formations at a gold exploration project in Chile. This innovative system was able to have a positive effect on productivity and reduce the consumption of mud and water by effectively managing and preventing lost circulation, high torque and borehole instability.