ImdexLeadingBrandLogo

technology

December 6, 2013

AMC SRU™ delivers $20,700 savings to operation in Western Australia

AMC SRU™ reduced the client’s operational costs and environmental impact on site in the Sandy Desert, East Pilbara Western Australia.
July 18, 2014

AMC SRU™ saves 147,000L of water in 20 days in Chile

A Chilean AMC SRU™ trial also demonstrated a significant reduction in water and mud consumption, together with other operating costs, when utilising the AMC SRU™ unit. The AMC SRU™ addressed the key challenges experienced at this site, where water access was limited and expensive.
April 21, 2016

AMC’s SRU™ limits spill risks in protected area in Canada

AMC’s SRU™ was implemented to assist operations and reduce costs on site at a uranium drilling project, located in Canada’s Patterson Lake South.
March 20, 2017

The modern driller: Benefitting from evolving solids control

AMC Solids Removal Unit™ range acts as an alternative to earthen sumps, to face increasing costs related to drilling fluids and waste disposal.
March 27, 2017

Combatting environmental impact with solids control: an 89% reduction in water use and minimal impact with AMC’s SRU™ technology.

May 29, 2017

Ground breaking system for torque, fluid loss and borehole instability

The AMC Borehole Optimization System™ (AMC BOS™) makes wire-line drilling more predictable, and encourages proactive versus reactive drilling.
May 29, 2017

Reactive versus proactive drilling: introducing the AMC BOS™

Content While no one would argue that fixing things as quickly as possible when they break is important, few realise the high costs associated with solely practising this mode of operation. Down the borehole, you can’t always predict when or how things will go wrong. And as accountability and productivity targets for drillers intensify, traditional drilling methods, such as grouting, casing and rod greasing are leaving too much room for error. With over 30 years of experience supporting the drilling industry, AMC Drilling Fluids & Products thought it was time to develop a proactive measure against downhole issues – leading […]
September 12, 2017

Scarborough geothermal project

As part of the construction of the Scarborough Beach Pool in Perth, Western Australia, AMC was involved with the supply and management of drilling fluids for the Scarborough Beach Pool Project’s geothermal drilling programme. Adam Jennings, Waterwell Manager for AMC in Perth discusses the achievements and challenges of the project.
November 1, 2017

A double win for IMDEX at WA Industry & Export Awards

IMDEX Limited is pleased to announce its recognition at the Western Australian Industry and Export Awards Ceremony held in Perth on 26 October 2017.