ImdexLeadingBrandLogo

borehole

May 29, 2017

Ground breaking system for torque, fluid loss and borehole instability

The AMC Borehole Optimization System™ (AMC BOS™) makes wire-line drilling more predictable, and encourages proactive versus reactive drilling.
May 29, 2017

Reactive versus proactive drilling: introducing the AMC BOS™

Content While no one would argue that fixing things as quickly as possible when they break is important, few realise the high costs associated with solely practising this mode of operation. Down the borehole, you can’t always predict when or how things will go wrong. And as accountability and productivity targets for drillers intensify, traditional drilling methods, such as grouting, casing and rod greasing are leaving too much room for error. With over 30 years of experience supporting the drilling industry, AMC Drilling Fluids & Products thought it was time to develop a proactive measure against downhole issues – leading […]
May 29, 2017

AMC BOS™ recovers an abandoned hole and boosts productivity in Arizona, USA

AMC BOS™ was a success at the Resolution Mine, saving a borehole that had been abandoned, reducing the costs and improving the productivity of the hole.
August 1, 2017

Proactive measures for the borehole

Geodrilling International asks Cory Mackay, of Imdex, about AMC Drilling Fluids & Products’ recently launched borehole optimisation system, the AMC BOS.
August 16, 2017

AMC BOS FIX™

AMC BOS FIX™ is a patent pending rapid fill grout, part of our new proactive solution for fluid loss and borehole instability – the AMC BOS™ (Borehole Optimisation System).
November 14, 2017

AMC Europe now offering same day delivery in the UK

February 28, 2018

AMC BOS™

Down the borehole, you can’t always predict when or how things will go wrong. AMC’s new, patent pending Borehole Optimisation System (AMC BOS™) anticipates fluid loss, lost circulation and unstable zones.
May 21, 2018

IMDEX delivering a step change for Drill and Blast applications

IMDEX is continuously refining its integrated product and service offering to enhance productivity and efficiency for clients.
May 30, 2018

Blasting the way to a more efficient, safer and environmentally sound mine site

AMC BORE HOLE STABILISER™’s unique formulation enables it to stabilise drill holes, but it also has multiple benefits across the entire mining operation; from reducing redrills, to optimising the blast patterns and paving the way to a safer workplace with reduced environmental impact. IMDEX’s mining solutions range aims to create this kind of value for all our clients.